Skip to main content
BETA A NHS service powered by standards. Feedbackopens in a new window will help us improve.

Patient Level Contract Monitoring

Provides patient level detail as one of a set of standards introduced by NHS England to enable national consistency of the flow of cost and activity information from providers to commissioners.

Documentation

About this standard

Publisher
NHS England
Also known as
Also known as PLCM.
Reference code
DCB3003 Amd 76/2020
Publication date
08/04/2021
Status
Active
Show definitions of statuses

Active. Active standards are stable, maintained and have been approved, assured or endorsed for use by qualified bodies.

Deprecated Deprecated standards are available for use and are maintained, but are being phased out, so new functionality will not be added.

Retired standards Retired standards are not being maintained or supported and should not be used.

Standard type
  • Collections
  • Information standards
Show definitions of standard types

Collections. A Collection is a systematic gathering of a specified selection of data or information for a particular stated purpose from existing records held within health and care systems and electronic devices.

Extractions. An extraction is a type of collection that is pulled from an operational system by the data controller and transmitted to the receiver without additional processing or transcription by the sender.

Information standards. Information standards are agreed ways of doing something, written down as a set of precise criteria so they can be used as rules, guidelines, or definitions.

Technical Standards and specifications. Technical standards and specifications specify how to make information available technically including how the data is structured and transported.

Collection level

Record level

Frequency

Dataset publication or collection occurs once a month.

Contact point

Using this standard

Applies to
  • All commissioners of NHS-funded services
  • All NHS and independent sector healthcare providers, operating under all versions of the NHS Standard Contract
  • All NHS providers of ambulance services, operating under the full-length version of the NHS Standard Contract
Impacts on
Implementation of this information standard impacts all health IT systems suppliers providing systems to the above providers; suppliers should work with their customers to determine necessary changes.
Is part of
Conformance date
31/10/2021
Effective from
01/09/2021

Topics and care settings

Topic
  • Data definitions and terminologies
  • Information governance
Care setting
  • Community health
  • Hospital
  • Mental health
  • Social care
  • Urgent and Emergency Care
Dependencies

This standard needs to be reviewed and implemented alongside the NHS Data Model and Dictionary.

Related standards

Review Information

Scope
NHS Services
Sponsor

Ming Tang, Managing Director of Data and Analytics, NHS England

Senior Responsible Officer

Vicky Mathwin, Deputy Director of Information and Intelligence, Specialised Services National Support Team, NHS England

Business Lead
Martin Hart, Assistant Head of Information (Reporting), NHS England
Approval date
25/03/2021
Post Implementation review Date
30/09/2022
Legal authority
  • Section 250 of the Health and Social Care Act 2012

    This information standard is published under section 250 of the Health and Social Care Act 2012

  • NHS standard contract

    This collection is published under the NHS Standard Contract.

More information

The Patient Level Contract Monitoring information standard is one of a set of standards being introduced by NHS England, initially on a voluntary basis, to enable national consistency of the flow of cost and activity information from providers to commissioners. The others are:

  • DCB2050 Aggregate Contract Monitoring
  • DCB2212 Drugs Patient Level Contract Monitoring
  • DCB3002 Devices Patient Level Contract Monitoring.

Having national standards to support contract monitoring will:

  • Reduce burden
  • Allow simpler and more consistent reporting
  • Allow easier reconciliation and validation of invoices
  • Provide support for service change planning and hospital capacity analysis
  • Improve forecasting
  • Allow greater monitoring of equity of access to services.

The PLCM standard supports the Aggregate Contract Monitoring (ACM) standard, by providing the patient level detail to the aggregate information contained within the ACM. It also contains details about patient level clinical activities that are not found in the current Commissioning Data Set (CDS) flows. Data is required to be submitted to NHS England on a monthly basis. In the long term, the developers will work with NHS England to enhance the Commissioning Data Sets (DAPB0092) to hold this information, thereby removing the need for separate flows.

About this change

The changes introduced in this release are designed to:

  • Remove the number of very general purpose (VGP) data elements, to improve information governance and data quality
  • Improve consistency across the other contract monitoring data sets
  • Include recent changes made to the NHS Data Model and Dictionary.

In addition, this information standard is now made mandatory for:

  • NHS or Independent Sector providers commissioned to provide acute services under the full-length version of the NHS Standard Contract.

The standard remains voluntary for other providers; full details are in the Change Specification.

Page last updated: 03 May 2024